Skip to content

Transformers and electrical testing

Transformer maintenance: high-vacuum filtration, oil, gasket and seal replacement, and connection tightening, together with field electrical testing. The tests to be performed are confirmed with the technical lead before the work is scheduled.

Compact substation and pad-mounted transformer installed outdoors

Reference standards

NOM-001-SEDE
Electrical installations
NOM-029-STPS
Electrical installation maintenance
NMX-J-116
Distribution transformers
IEEE C57
Transformer test reference

Executed work

  • Current transformers mounted inside a metering cabinet
    Fig. 01Current transformers mounted inside a metering cabinet
  • Metering base with current transformers and a fuse block
    Fig. 02Metering base with current transformers and a fuse block
  • Electronic voltage regulator installed beside production equipment
    Fig. 03Electronic voltage regulator installed beside production equipment

Service scope

  1. 01

    Dielectric oil analysis

    Sampling on site and management of the insulating-oil analysis.

  2. 02

    High-vacuum filtration

    Filtration and dehydration of insulating oil using high-vacuum equipment.

  3. 03

    Oil, gasket and seal replacement

    Replacement of oil and sealing components based on the condition of the unit.

  4. 04

    Connection tightening and cleaning

    Inspection and tightening of connections, cleaning of bushings and insulators.

  5. 05

    Field electrical testing

    Ductor, insulation resistance, core insulation, TTR and power factor, subject to the requirement and technical confirmation.

  6. 06

    Protection and breaker testing

    Relay and breaker testing, Hi-Pot and VLF, subject to the requirement and technical confirmation.

Tests performed and documented

What you receive at close-out

  • Technical report on the tests performed by GC
  • Result, report or certificate from the laboratory or authorized unit where applicable
  • Maintenance recommendations based on the condition found

Field tests included in the scope are performed and documented by GC. Analyses or verifications that require accreditation are coordinated with the corresponding accredited laboratory or authorized unit.

  • Tests to be performed confirmed with the technical lead
  • Lockout/tagout applied before any work on the equipment
  • Oil sampling and dielectric analysis
  • Measured values compared against the applicable reference criteria
  • De-energization and return to service planned in advance

Get a quote for the work you need

Tell us the equipment, the location and the type of intervention. We review the information to prepare the quotation or to ask for what is missing.