Industrial maintenance and field service

Preventive maintenance, corrective intervention and field execution inside plants and industrial facilities. Electrical, mechanical and pneumatic work is coordinated under one project and one technical lead, so a job that crosses two or three disciplines does not mean hiring and coordinating three suppliers.

Pump skids and process piping installed on a plant floor

Reference standards

NOM-029-STPS
Electrical installation maintenance
NOM-004-STPS
Machinery guarding and safety devices
NOM-009-STPS
Work at height
NOM-017-STPS
Personal protective equipment

Executed work

  • Voltage regulator and UPS installed beside a production line
    Fig. 01Voltage regulator and UPS installed beside a production line
  • Motor control center and variable-frequency drives in an electrical room
    Fig. 02Motor control center and variable-frequency drives in an electrical room
  • Starter and electrical conduit installed on a wall
    Fig. 03Starter and electrical conduit installed on a wall

Service scope

  1. 01

    Preventive maintenance

    Inspection, measurement and service routines at the frequency agreed for each system and piece of equipment.

  2. 02

    Corrective maintenance

    Diagnosis, repair or component replacement and return to service once a failure has occurred.

  3. 03

    Field execution

    Crew, tooling and on-site supervision for work inside the plant.

  4. 04

    Shutdown work

    Operations scheduled inside a production shutdown, with a defined sequence and timing.

  5. 05

    Cross-discipline coordination

    Electrical, mechanical and pneumatic work within one job and under one project lead.

  6. 06

    Reporting and handover

    Documented close-out: what was done, what was replaced and what remains under observation.

The work is planned before anyone touches the equipment

What you receive at close-out

  • Technical report of the work performed
  • Photographic evidence, before and after
  • Observations and recommendations for the next service

Every intervention starts with a site survey: equipment condition, access, permits and the window available. Scope, materials and the responsible technical lead come out of that survey, in writing, before a single tool is picked up.

  • Site survey before quoting
  • Scope, materials and technical lead in writing
  • Lockout/tagout applied before any intervention
  • Safety supervision throughout the operation
  • Close-out with a technical report and open observations

Get a quote for the work you need